. .
risk-based-inspection

Risk Based Inspection

RIM provides RBI methodologies on how, when and where inspections of piping, tanks and vessels, rotating/moving components, platform structures and sub sea pipelines should be inspected, maintained, tested, and replaced.

Risk Based inspection (RBI) Strategy is developed following execution of a Risk Assessment, which would detail the recommended approach that the client should adopt in order to ensure effective asset integrity management. The strategy will also include recommended inspection schedules and an analysis of the most probable failure modes in order to assist in the selection of the most appropriate inspection/monitoring techniques.